Trans Titiwangsa V2
near Pos Penangau, Kelantan (မလေးရှား)
Viewed 660 times, downloaded 25 times
Trail photos
Itinerary description
横跨蒂蒂旺沙山脉 第二版本 V2 是登山界中数一数二非常挑战及艰难的路线之一。不止只要攀高越岭,还得负重20公斤以上的背包徒步登山6天5夜。
为了这趟旅程,我们精心的备战数月,增强负重训练,体能训练等等。终于在2023年4月20日步上了这趟6天5夜回忆满满的“传奇之路”。
Trail Head Information:
🚩 Located at Blue Valley Farm, Cameron Highland
🚩 Level of Difficulty: Extremely Hard 9/10
🚩 Start and ended at different Trail Head
🚩 Pennisular G2, G3, G4 & G6 & some others
🚩 Out and back hiking 6D5N about 76.42 KM
Note:
✴️ A standard 6D5N hike and camp trip
✴️ Very difficult. Must be physically and mentally strong to complete the trail.
✴️ Carrying load about 23 KG daily.
✴️ Each day facing with different challenges and diffifulties
✴️ Finally completed my bucket list - V2
List of Mountains:
⛰️ Gunung Yong Belar 2,181 meter [G3]
⛰️ Gunung H2O
⛰️ Gunung Junction 2,072 meter
⛰️ Gunung Gayong 2,173 meter [G4]
⛰️ Gunung Korbu 2,183 meter [G2]
⛰️ Puncak View
⛰️ Gunung Bubu 1,974 meter
⛰️ Gunung Tok Nenek 1,916 meter
⛰️ Gunung Yong Yap 2,158 meter [G6]
Time Log:
Day 01
✳️ 0600 : Pos Renggil to Blue Valley Dam via 4WD
✳️ 0735 : 4WD drop off point (start hike)
✳️ 0813 : Blue Valley Dam
✳️ 0935 : Pintu Rimba (Trail Head)
✳️ 1129 : Kem Tudung Periuk
✳️ 1234 : Pelaur Waterfall
✳️ 1539 : Kem Kasut
Total Time : 8H4M
Day 02:
✳️ 0655 : Kem Kasut
✳️ 0803 : Gunung Yong Belar
✳️ 0928 : Kem Kuali
✳️ 1426 : Puncak H20
✳️ 1628 : Kem H20
Total Time : 9H33M
Day 03:
✳️ 0702 : Kem H20
✳️ 1056 : Puncak Junction
✳️ 1331 : Kem Cerek
✳️ 1525 : Simpang Proton
✳️ 1539 : Gunung Gayong
✳️ 1734 : Gunung Korbu
✳️ 2225 : Puncak Junction
Total Time : 17H23M
Day 04:
✳️ 0833 : Puncak Junction
✳️ 1318 : Kem Lembah Agas
✳️ 1509 : Puncak Bonsai Semak
✳️ 1645 : Puncak View
✳️ 1742 : Kem DGU
Total Time : 9H9M
Day 05:
✳️ 0730 : Kem DGU
✳️ 0917 : Puncak Belumut
✳️ 1001 : Kem Kacang
✳️ 1145 : Puncak Kambing
✳️ 1209 : Gunung Tok Nenek
✳️ 1310 : Puncak Kayung
✳️ 1550 : Gunung Bubu
Total Time : 6H20M
Day 06:
✳️ 0720 : Gunung Bubu
✳️ 0826 : Kem Hassan
✳️ 1005 : Simpang YY - Bubu
✳️ 1101 : Gunung Yong Yap
✳️ 1308 : Kem Balak Pecah
✳️ 1344 : Kem Sungai Jeruk
✳️ 1540 : Kem Agas
✳️ 1756 : Kem Sungai Y
✳️ 2014 : Pos Renggil (Trail Head ~ End)
Total Time : 12H56M
Initerary:
🔹A day before....
Overnight at Farm House Homestay in Cameron Highland.
🔹 Day 01: Thursday, 20 April 2023 🔹
Blue Valley Dam to Kem Kasut
➡️ 4WD from Pos Renggil 🛺 ➡️ Blue Valley Dam ➡️ Pintu Rimba (Trail head) ➡️ Kem Tudong Periuk ➡️ Kem Kasut 🏕️
◽ Most 'Santai' day
◾ Transferred from Pos Renggil to trail head by 4WD.
◽From here to Kem Kasut, will overnight here
◾ All the way up until campsite. Detour to Pelaur waterfall.
◽ Water point just beside campsite. Can refill water and shower.
🔆 Highlight: Pelaur Waterfall
🔹Day 02: Friday, 21 Aprill 2023 🔹
Kem Kasut to Kem H20
Kem Kasut ➡️ Gunung Yong Belar ➡️ Kem Kuali 💧➡️ Puncak H20 ➡️ Kem H20 🏕️
◽ Most Scenery day
◾ Start hiking at 0655 hrs. It took about 1 hour to Gunung Yong Belar.
◽ Very lucky today weather is good and can enjoy nice view.
◾ Overnight at Kem H20. Water point available, can shower.
🔆 Highlight: G3
🔹Day 03: Saturday, 22 April 2023 🔹
Kem H20 to Puncak Junction
Kem H20 ➡️ Puncak Junction 🏕️ ➡️ Kem Cerek 💧 ➡️ Simpang Proton ➡️ Gunung Gayong ➡️ Gunung Korbu ➡️ Simpang Proton ➡️ Kem Cerek ➡️ Gunung Junction
◽ Most Longest Hike
◾ After breakfast and briefing heading to Puncak Junction. Pitch our tent here and pack light to Gunung Gayong (G4) & Korbu (G2)
◽ Stop at Kem Cerek to refill water. This is the hardest water point. Trail spoiled and covered up due to landslide.
◾ Longest hike of the entire trip and reached campsite (Puncak Junction) at 2225 hrs.
◽ Enjoy late dinner yee mee soup cooked by Chin ... Yummy
◾ Campsite NO water point
◽No more water point after Kem Cerek. Advice to bring min. 1.5 litre to G. Korbu and left the balance at Kem Cerek. Carry back to campsite while otw back.
🔆 Highlight : G2 & G4
🔹Day 04: Sunday, 23 April 2023 🔹
Gunung Junction to Kem DGU
Gunung Junction ➡️ Anak Junction ➡️ Kem Lembah Agas ➡️ Puncak Bonsai Semak ➡️ Puncak View ➡️ Kem DGU 🏕️
◽ Most challenging day
◾ Start our hike today abit late than usual
◽ Today challanges was "under ground tunnel" before anak junction & puncak view. Need to cross over the cliff with assistance of rope.
◾Campsite with water point
🔆 Highlight: Puncak View = dangerous zone
🔹Day 05: Monday, 24 April 2023 🔹
Kem DGU to Puncak Bubu
Kem DGU ➡️ Gunung Belumut ➡️ Kem Kacang 💧 ➡️ Puncak Kambing ➡️ Gunung Tok Nenek ➡️ Gunung Kayung ➡️ Kem Lopak Air ➡️ Gunung Bubu
◽ Most Faster day (turbo engine)
◾ After breakfast start moving to Gunung Tok Nenek. Left our backpack at junction and pack light to Peak. Stunning view at Peak.
◽ Suppose to stop at Kem Lopak Air and overnight here but reached campsite too early. We decided to overnight at Puncak Bubu.
◾Campsite at Gunung Bubu NO water point. Need to carry water from Kem Lopak Air. At least min 2 litre per person. Some of our members carrying 5 litre.
◽Remark: Water point at Kem Lopak Air the water very little only. Take long time to refill. Definitly no shower here.
🔆 Highlight: Gunung Tok Nenek, refill water experience at KPA & Nasi Lemak Dinner finger linkin good
🔹Day 06: Tuesday, 25 April 2023 🔹
Puncak Bubu to Pos Renggil (Trail Head)
Puncak Bubu ➡️ Simpang YY - Bubu ➡️ Gunung Yong Yap ➡️ Kem Sungai Jeruk ➡️ Kem Sungai Y ➡️ Pos Renggil
◽ Most Excited day
◾ Last day of the trip. Everyone was so excited today and hoping that can finish the hike as earlier as possible and back to civilisation.
◽ Left our heavy backpack at Simpang YY - Bubu and pack light to Summit. It took me 24 mins to reached.
◾ After lunch, continue our hike descending until Kem Sungai Y. Regroup again and walk together as a team until trail head.
◽ The moment we saw the fallen bridge we knew that we are very closed. Althought the "never ending" road is very far and exhausted but it won't stop us until we reached Pos Renggil carpark.
🔆 Highlight: G6
🔹The day after....
Overnight at Farm House Home Stay, Cameron Highland. Drove back home the next day. Trip end.
Permit & Guide:
📝 Compulsory, apply with Forestry Department
🥷 Advisable to hired a guide or engage with trip organiser
Trail Head Location:
🌐 Blue Valley Dam
🌐 GPS: 4.599418, 101.412419
🐺 11 pax. Marco, Westley, Winnie, Seng Giap, Nicholas, Edward, Kit, Ding, Jia Cheng, Ruey Peng & Me.
Guide by Chin & Kelly (Hardcore Extreme Adventure)
📮 hikefuntw@gmail.com
🏁 20 - 25 April 2023
Waypoints
Day 01: 4WD Drop Off Point to Kem Kasut
Start our hike at 0735 hrs at 4WD drop off point. Bridge collapse and have to walk extra miles to Blue Valley Dam. 🖼️ 2/6: Bridge collapse, vehicle can't pass thru 🖼️ 3/6: 4WD
Kem Tudung Periuk
Reached at 1129 hrs 🖼️ 3/6: Left to Air Terjun Pelaur. Right to Yong Belar Summit 🖼️ 5/6: Kem Pelaur
Gunung Junction
Reached at 1056 hrs Set up our tent and will overnight here. Light pack to Gunung Gayong & Gunung Korbu Start moving at 1210 hrs to G. Korbu & G. Gayong
Back to Campsite ~ Puncak Junction
Reached at 2225 hrs 🖼️ 3/6: Our dinner Yee Mee...yummy
Day 05: Kem DGU to Puncak Bubu
Start at 0729 hr 🖼️ 2/6: from left: Chin, Winnie, Rui Ping, Seng Giap, Kit, Jia Cheng
Kem Lopak Air
Reached1402 hrs Suppose to camp here but reached earlier than expected. So we decide to proceed to Puncak Bubu 🖼️ 2/6: Ruey Peng
Gunung Tok Bubu
Reached 1550 hrs 🖼️ 3/6: Campsite. Limited space 🖼️ 4/6: Nasi Lemak dinner - best ever
Day 06: Puncak Tok Bubu to Pos Renggil
Start at 0720 hrs Last day of our hike. Targeted to finish our hike by 2100 hrs
Kem Hassan
Reached 0826 hrs 🖼️ 1/6: Kelly, Guide & Sweeper 🖼️ 3/6: Gunung Yong Yap
You can add a comment or review this trail
Comments