Kilimanjaro (7) Gipfelsturm: Uhuru (5895m)
near Barangata (Tanzania)
Viewed 5272 times, downloaded 44 times
Trail photos
After a short break, we continue via the Millenium Camp to Mweka Camp. The descent is long, exhausting, difficult and sometimes very slippery. Luckily it did not rain with us. On this Gipgfeltag we had super-weather, all day sunshine. From the summit you can see Mt. Meru.
Because of the strong storm, it was very cold on the summit. Crampons you do not need, it is only by scree.
The track ends at Stella Point, my GPS was full, unfortunately. The descent to the camp continued east in the scree. The wide path is easy to see. The descent from the Barafu [see Kilimanjaro (8)] is only a plan for me (manuel entered on maps). This is amazingly accurate. There, however, the height and time information is missing.
Therefore, attention !!! The calculated route length is not correct! Also not the information for ascent and descent!
See http://tortic.to.ohost.de
Waypoints
03 Airport Kilimanjaro
03-JAN-09 14:12:25 - 03-JAN-09 14:12:25
04 Keys Hotel
03-JAN-09 15:36:55 - 03-JAN-09 15:36:55
07 Machame Gate
04-JAN-09 10:48:59 - 04-JAN-09 10:48:59
08 Registration
04-JAN-09 11:06:27 - 04-JAN-09 11:06:27
10 Rastplatz (Mittag)
04-JAN-09 12:56:07 - 04-JAN-09 12:56:07
13 Machame Camp
04-JAN-09 17:41:39 - 04-JAN-09 17:41:39
14 Machame Hut (Registration)
05-JAN-09 8:42:42 - 05-JAN-09 8:42:42
17 Rastplatz (Mittag)
05-JAN-09 11:17:10 - 05-JAN-09 11:17:10
18 Shira Camp (new)
05-JAN-09 13:15:41 - 05-JAN-09 13:15:41
19 Shira Cave
05-JAN-09 16:14:45 - 05-JAN-09 16:14:45
20 Shira Camp (old)
05-JAN-09 16:45:51 - 05-JAN-09 16:45:51
22 Raststelle
06-JAN-09 11:45:47 - 06-JAN-09 11:45:47
23 Raststelle (Mittag)
06-JAN-09 12:19:42 - 06-JAN-09 12:19:42
25 Lava Tower
06-JAN-09 14:17:11 - 06-JAN-09 14:17:11
26 Lava Tower Camp
06-JAN-09 14:31:21 - 06-JAN-09 14:31:21
29 Barranco Camp
06-JAN-09 15:35:34 - 06-JAN-09 15:35:34
32 Scheitelpunkt Barranco Wall
07-JAN-09 10:29:04 - 07-JAN-09 10:29:04
33 Kleiner Gipfel
07-JAN-09 10:40:00 - 07-JAN-09 10:40:00
35 Raststelle Karanga Valley
07-JAN-09 12:28:29 - 07-JAN-09 12:28:29
36 Karanga Camp
07-JAN-09 12:54:00 - 07-JAN-09 12:54:00
38 Barafu Camp (oben)
08-JAN-09 12:42:51 - 08-JAN-09 12:42:51
39 Uhuru Peak
09-JAN-09 7:35:05 - 09-JAN-09 7:35:05
40 Stella Point
09-JAN-09 8:01:36 - 09-JAN-09 8:01:36
41 Mweka Camp
09-JAN-09 16:37:06 - 09-JAN-09 16:37:06
42 Mweka Gate
10-JAN-09 11:10:54 - 10-JAN-09 11:10:54
You can add a comment or review this trail
Comments