Avance de obra 28/02/23
near El Guayan, Azuay (Ecuador)
Viewed 5 times, downloaded 0 times
Itinerary description
Avance de obra desde la entrada a la mina de Lastre, solo tendido de material, clima lluvioso(garúa)